Sikorsky Product History

Sikorsky S-64

Background

With the success of the experimental S-60 flying crane helicopter Sikorsky received corporate approval to proceed with the development of a production prototype, the S-64 Skycrane. This was to be more powerful than the S-60 and use turbine engines rather than the piston engines of the S-60. The basic mission was heavy cargo transport, with quick, safe and efficient turn-around time due to the external cargo configuration. This mission was later expanded to include a method of internal transport, particularly of troops, using a pod attached to the underside of the aircraft.

Igor Sikorsky with model of S-64 crane helicopter

First flight of the S-64 was on May 9, 1962, only 13 months from program go-ahead. Only two months later, in July 1962 the aircraft was flown to Ft. Benning Georgia for Army evaluation. Up to this time, everything was company funded.

The U.S. Army bought six S-64s for evaluation at a cost of $13 million. They designated it the CH-54A Tarhe. Four of these aircraft eventually went to Vietnam to assist in the war effort. The German government also bought two for evaluation. A U.S. Army production order followed the initial Vietnam evaluation. The Germans did not buy any Skycranes, preferring the CH-53A with its internal cabin.

Initially the aircraft were designated the S-64A. With a production order from the Army, including numerous configuration and performance changes, including wider chord blades, the aircraft were designated the CH-54A by the Army and the S-64E in Sikorsky terminology. After a number of years of production, the mission capabilities were expanded again with the CH-54B/S-64F configuration.

S-64s in hover flight

Configuration Features

Like the S-60 before it, the main feature of the S-64 Skycrane was its basic configuration with no cabin, just a simple “stick” fuselage designed to carry cargo externally. Two Pratt & Whitney JFTD-12 turbine engines were used with a new dynamic system. The 72 foot diameter rotor was derived from the S-56/S-60 with a sixth blade added, plus additional blade chord for increased blade area. A tricycle landing gear with a nose wheel and main landing gear aft configuration, opposite to what was used on the S-60, was chosen to ease ground maneuvering around the payload. This was one of the lessons learned from the experimental S-60 program. A tail skid was included to protect the tail in an extreme nose up landing. The cockpit was below the structure and included a third pilot’s station facing aft to be used to fly the aircraft as it attached and released the payload. The cockpit was sized to carry a crew of five – the pilot, copilot, aft-facing pilot, and two mechanics. Since the aircraft was designed to operate for extended periods in remote areas, it was decided to include space for the two mechanics onboard the aircraft. One other interesting feature is the lack of cowlings over the dynamic system hardware. Since speed, and therefore drag reduction, was not a requirement, it was decided to simplify maintenance access, reduce weight and save production costs by not using these cowlings.

The transmission is tilted 3 degrees to the left and not tilted forward. This allows it to hover level over the load being picked up. As a result of this, in cruise flight the cockpit is tilted to the right and theaircraft flies with a nose down attitude.

General Arrangement Drawing

Mission Systems

The aft-facing cockpit was included to ease picking up and releasing the cargo loads. Unlike the experimental S-60, it did not use a rotating pilot’s seat for the aft pilot’s station. The S-60 had shown that a separate aft pilot’s station was preferable. The S-64 aft pilot’s station is believed to be the first use of fly-by-wire controls on a helicopter. There were two modes. In one the pilot controlled the aircraft through the SAS servos, which gave fine control but limited authority. In the other mode, he put inputs into the autopilot (trim) servos. This allowed full amplitude control, and moved the front sticks so that the pilots knew what was going on. They could override the trim servos since they were connected to the sticks by springs and magnetic brakes.

A 20,000 pound capacity cargo hoist was included for single point suspension of the cargo load. This allowed the load to be moved up and down while the aircraft was stationary. The hoist cable was fed to the drum by a compensator linkage that automatically added or reduced collective pitch to help hold vertical position. Additionally there was a system of four small hoists of 5,000 pound capacity each to support the cargo in a different configuration. To further improve cargo handling on the ground, the landing gear could kneel over the load to facilitate attachment and detachment.

Various cargo/personnel pods were also designed and fabricated for internal cargo, personnel transport, medical, and maintenance purposes. In May 1965, the crane demonstrated transport of 90 troops using the cabin pod.

S-64 with personnel pod attached

Other Representative Missions

General Characteristics and Performance

 S-64AS-64E
CH-54A
S-64F
CH-54B
Design Gross Weight38,000 lbs38,000 lbs47,000 lbs
Overload Gross Weight41,000 lbs 42,000 lbsN/A
Weight Empty17,240 lbs19,120 lbs19,700 lbs
Useful Load20,760 lbs22,880 lbs27,300 lbs 
Payload16,000 lbs20,000 lbs25,000 lbs
Rotor Diameter72 ft72 ft72 ft
Blade Chord1.97 ft1.97 ft2.167 ft
Blade Twist-13º-13º-14º  nonlinear*
Tail Rotor Diameter16 ft16 ft16 ft
Tail Rotor Chord1.28 ft1.28 ft1.28 ft
Length88 ft 6 ins88 ft 6 ins88 ft 6 ins
Height25 ft 5 ins25 ft 5 ins25 ft 5 ins
PowerplantTwo P&WA
JFTD-12A-1
Two P&WA
JFTD12A-4A
Two P&WA
JFDT12A-5A
Engine Power4,050 hp4,500 hp4,800 hp
Transmission Limit5,400 hp6,600 hp7,900 hp
Crew333
Maximum Cruise Speed102 knots115 knots104 knots
Range166 nm217 nm208 nm
Hover Ceiling, In Ground Effect9,700 ft10,600 ft
Service Ceiling10,500 ft13,000 ft
Rate of Climb1,400 ft/min1,700 ft/min

*With its nonlinear 14º twist, the S-64F had the highest figure of merit (.73) of any Sikorsky rotor up to that time. For comparison the CH-53 had a figure of merit of .69. The downside was that the S-64F was speed limited to 110 knots due to high stresses at speed caused by the high twist. This was acceptable to the Army because its mission was to carry external loads, not to achieve high speeds.

With the simple light weight fuselage configuration, the cranes had very low empty weight to gross weight ratios, as low as .42 on the
S-64F. Without payload this gave the aircraft outstanding performance. Numerous altitude and time-to-altitude records were broken by the Skycranes. In level flight the S-64F flew at 36,122 feet.

Hover Records

PayloadMaximum Altitude
4,410 lbs31,480 ft
11,025 lbs25,510 ft
22,050 lbs17,212 ft
33,075 lbs10,850 ft

Time to Climb Records

AltitudeTime to Climb
9,843 ft1 min 22.2 sec
19,686 ft2 min 58.9 sec
29,529 ft5 min 57.7 sec

Production History

United Aircraft Corporate approval for the design and development of the S-64 was given in April 1961. Up to the first flight on May 9, 1962 everything was company funded. In June 1963 the U.S. Army bought the six S-64s for evaluation. The FAA Type Certificate was granted on July 30, 1965. The CH-54B configuration production began in 1969.

Production by Year

YearQuantity
19621
19631
19646
19650
19662
196722
196830
196913
197012
19717
19720
19731
19741
19753
Total99

54 CH54As and 35 CH-54Bs for the Army, and 12 S-64Es and Fs for commercial customers (two aircraft were returned, refurbished, and resold).

Sikorsky also launched an effort to sell the S-64 commercially. A total of ten Skycranes were sold or leased to commercial customers between 1968 and 1976. Seven of these were sold to Ericson Air-Crane, Inc. of Medford Oregon for logging operations and some firefighting and construction activity. By the 1980s forest firefighting became the main mission for the Ericson cranes.

In 1992 Sikorsky agreed to sell the Skycrane Type Certificate to Ericson. This transferred all manufacturing and support rights worldwide to Ericson for both the S-64E, with a 10-ton payload, and the S64F, with 12.5-ton payload. Ericson built up a fleet of S-64s rebuilding army surplus CH-54As and CH-54Bs. Their fleet rose to 18 aircraft by 2000. Additional Ericson Air-Cranes have been sold internationally. They continue in use today.

The CH-54s were retired from Army service in 1995.

Ericson Air-Crane fighting a fire

Related Models

In 1968 Sikorsky proposed a growth crane to the Army, the S-64B, which used a 79 foot rotor and three engines with a new main gearbox. Originally both the General Electric T-64-GE-16 and the Lycoming T-55- l-11 were proposed. The design was for a payload of 17.9 tons, with a design gross weight of 50,000 lbs and an overload gross weight of 64,700 lbs. Weight empty was 26,669 lbs; maximum speed was 100 knots with payload and 130 knots without payload. This concept was not pursued beyond the proposal stage, but the three engine/79 foot rotor became the basis of the CH-53E, using the General Electric engines

The proposed S-64B Crane

The basic concept of the crane helicopter was extended by the army into the HLH, or Heavy Lift Helicopter. There was a competition for this aircraft between Sikorsky and Boeing Vertol. This was won by Boeing Vertol in 1973 using a tandem rotor configuration. The helicopter used two 92 ft diameter rotors in a tandem configuration and had a gross weight of 118,000 lbs. The program entered design and development but was terminated in 1974 before entering production due to development issues.

Additional Information Sources

SKYCRANE – IGOR SIKORSKY’S LAST VISION, by John A McKenna, retired Sikorsky Executive Vice President. Published by the American Institute of Aeronautics and Astronautics, Inc. in 2010. ISBN 978-1-60086-756-9.

Related Articles

Sikorsky Lifts the Army

The U.S. Army saw the possibilities of the helicopter early in its development, thus beginning a relationship with Sikorsky Aircraft that continues to this day.

Read More »